Thursday, April 23, 2009

il colosseo

This is the level on which the insulation and then the hearth will be built.
The strips in the front are mortared in and will be used to tie the bricks to the blocks.
To this point it was quite fast, the pace slows down a bit now.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.